Welcome to Jain Irrigation Systems Ltd.
Welcome to Jain Irrigation Systems Ltd.
After well is drilled and cleaned, casing / screen pipes need to be lowered into the well. Pipes are hold onto the lifting hoist / lifting cap and lifted over the drilled hole till the joint is made. We had the full range of lifting caps suitable for different class of pipes i.e. medium well, deep well etc.
SIZE | CODE | DESCRIPTION |
4" | CFTLC04MW | JMW LIFTING CAP 100 MM |
4.5" | CFTLC04.5MW | JMW LIFTING CAP 115 MM |
5" | CFTLC05MW | JMW LIFTING CAP 125 MM |
6" | CFTLC06MW | JMW LIFTING CAP 150 MM |
7" | CFTLC07MW | JMW LIFTING CAP 175 MM |
8" | CFTLC08MW | JMW LIFTING CAP 200 MM |
10" | CFTLC10MW | JMW LIFTING CAP 250 MM |
12" | CFTLC12MW | JMW LIFTING CAP 300 MM |
14" | CFTLC14MW | JMW LIFTING CAP 350 MM |
16 | CFTLC16MW | JMW LIFTING CAP 400 MM |
SIZE | CODE | DESCRIPTION |
6" | CFTLC06DW | JDW LIFTING CAP 150 MM |
8" | CFTLC08DW | JDW LIFTING CAP 200 MM |
10" | CFTLC10DW | JDW LIFTING CAP 250 MM |
12" | CFTLC12DW | JDW LIFTING CAP 300 MM |
14" | CFTLC14DW | JDW LIFTING CAP 350 MM |